← All electrical guides

Plan a new installation

A new outlet quote depends on position, load and access

A request for more power points or a dedicated circuit begins with what the outlet will serve and where it is wanted. The cable route, protection and board capacity are property-specific matters for a licensed electrical contractor to assess.

Immediate danger? Keep clear and use official emergency guidance instead of this form.

Describe your electrical job
Finished Australian double power point in a home-office setting

The first decision

Describe the intended use before comparing a price

Give the provider the appliance or equipment details, the preferred outlet position and whether there are access constraints. A low initial number and a higher comprehensive quote may not describe the same work. Compare their written inclusions before choosing.

Read Queensland's fixed electrical-work guidance ↗

What to tell the contractor

  • 01The number of outlets, preferred positions and equipment to be powered.
  • 02Whether the room is upstairs, in a unit or difficult to access, if known.
  • 03Who owns or manages the property and can approve alterations.

These are enquiry facts, not instructions to inspect, test or alter electrical equipment.

Compare the written work

Three questions for the scope

01 / Ask

Does the price include cable route, fittings, protection, testing and making good?

02 / Ask

Will the proposed equipment need a separate circuit after site assessment?

03 / Ask

What work is excluded or subject to inspection before a firm price?

What changes the scope?

Position matters as much as outlet count. Tell the contractor if the point is for a fixed appliance, desk setup or occasional use, and provide the equipment rating if available. A unit may need owner or body-corporate consent for the proposed cable route. Ask whether wall repair and painting are included. If a dedicated circuit is recommended, request the reason and compare the circuit, protection and testing in the written price.

Common questions

Questions about power points and new circuits

If a board change is proposed ↗

For property access decisions, read Power points and new circuits in Indooroopilly.

Power points and new circuits questions

What should a quote for new power points include?
Ask whether the quote includes the number and positions of outlets, cable route, access, any required protection, making good, testing and the supplied fittings. The actual installation method must be determined by a licensed contractor at the property.
How much does installing a new power point cost?
There is no reliable fixed price for this site's audience without the actual cable route, access, protection and site conditions. Describe the proposed location and equipment, then compare written quotes for the same scope. The forum price in the question source is an anecdote, not a current local rate.
What information helps an electrician quote new upstairs power points?
State how many outlets you want, their preferred positions, the intended loads and what roof or wall access is available. A licensed contractor must inspect the property to confirm a safe route and scope; no online sketch can guarantee the method.

Ordinary enquiries

Describe your power points and new circuits job

Enquire about power points and new circuits

Share the job and property context rather than guessing a technical answer.

Include relevant facts from this guide and what you need clarified in writing.

Submitting this form does not confirm provider availability, timing or acceptance of the work.

Your details are only used to assess and process your enquiry. See our privacy policy.